Sunday, October 11, 2020



Painting the radar


Oxidized


Still repairs needed but cleaned and fresh coat of paint


Khiem Pham visiting for a fundraiser


Pilots display in the back of the plane, Herc equipment.

 




8-17-20  installation date for the propellers


USMC installing the first prop


All Props on great ending to a long day


Prepping for next day with stabilizer


Early 8-18-20 before the stabilizer lift


Prop assembled and getting locked down


Finally a years work


Looks like a plane

 


Stabilizer with base coat


Alot of dust on the fuel tank


Stephen wet sanding the stabilizer



Basecoat


Painting the Fuel tanks


Prop hub assembly


Camo added to Stabilizer


Final basecoat to the fuel pod/tank

 


Flipping the Vertical Stabilizer over


Mattresses set out to keep from damaging stabilizer


After the Flip


Sanded and waiting for washdown and paint.

 

 July work on the C-130 Saigon Lady


In the Motor Pool for finishing


Moving tanks to the Motor Pool for finishing


Originally stored in the main hangar


Props set out after assembly


Crew assembling the tri-blade props for the Saigon Lady



Painting the radar Oxidized Still repairs needed but cleaned and fresh coat of paint Khiem Pham visiting for a fundraiser Pilots display in ...