Sunday, October 11, 2020



Painting the radar


Oxidized


Still repairs needed but cleaned and fresh coat of paint


Khiem Pham visiting for a fundraiser


Pilots display in the back of the plane, Herc equipment.

 




8-17-20  installation date for the propellers


USMC installing the first prop


All Props on great ending to a long day


Prepping for next day with stabilizer


Early 8-18-20 before the stabilizer lift


Prop assembled and getting locked down


Finally a years work


Looks like a plane

 


Stabilizer with base coat


Alot of dust on the fuel tank


Stephen wet sanding the stabilizer



Basecoat


Painting the Fuel tanks


Prop hub assembly


Camo added to Stabilizer


Final basecoat to the fuel pod/tank

 


Flipping the Vertical Stabilizer over


Mattresses set out to keep from damaging stabilizer


After the Flip


Sanded and waiting for washdown and paint.

 

 July work on the C-130 Saigon Lady


In the Motor Pool for finishing


Moving tanks to the Motor Pool for finishing


Originally stored in the main hangar


Props set out after assembly


Crew assembling the tri-blade props for the Saigon Lady



Tuesday, May 26, 2020

Repairing the cockpit leaks.


Cockpit escape hatch first time open after winter.  Need to have the access to work on any top of the fuselage problems, as we don't have the use of access equipment.


A new seal required around opening.


Duct tape for winter proof, now removed.  Opening scraped and brushed down to removed flaking paint an tape residue.


Fuselage view from escape hatch/port.  The need for using this is obvious, inside the plane and don't have to borrow equipment.

Rudder work


Getting ready to remove cast linkage for rudder.

Broken sometime prior to move from Smithsonian.  Need to have it welded to the main portion in the repair hangar.

Wednesday, May 13, 2020

Ramp Down

First open of the Cargo Ramp.

Today we decided to bypass the hydraulics to finally open the ramp.  We placed the 5 ton chain fall and connected it to the ramp in 2 locations near the lip.


First light after a long wait.  Other than the slow operation of the chain fall all went smoothly.


Still going to leave the safety ropes up, though probably better to move back so we can move around.


Cylinders fully extended, no loss of fluid or seaping.


Not the ultimate solution, or prettiest, it works until we can get a better solution in place that's as safe.

Thursday, May 7, 2020

Flowers and a different view

Random nose photos.

Such a presence, minus the finger in the shot...


Almost looks as though she's smiling now her nose is done.


Will try to place more flowers, need to start sprucing up the area for the start of guests arriving.  that and future surprises...

Cargo ramp hydraulics

Cargo Ramp hydraulic system.


Started work on the ramp system so that we can provide better access to impaired and disabled veterans.  Most of what is here we can safely bypass to lessen the complexity of the overall system.


Hoping to install a bypass auxiliary electric pump so this hand pump won't have to be our default method of door movement. 

An Ann Arbor visit in Geneseo

A visit from Ann Arbor, Michigan.  


David Draper, Commander of the Ann Arbor chapter of the American Legion Post #46, with his grandson Connor, in the cockpit of the C-130 Saigon Lady.  His wife Minnie also accompanied them.


David and Connor in the cargo area of Saigon Lady.  David spent much of his early service flying from Thailand with supplies for the combat areas of Vietnam.


David handing our Larry Jones the money he collected for raffle tickets in Ann Arbor.  As well he came with a check that matched the funds they had raised from a retired auto industry executive, Robert Lutz.  Many thanks for their contributions to the project.


Painting the radar Oxidized Still repairs needed but cleaned and fresh coat of paint Khiem Pham visiting for a fundraiser Pilots display in ...